The vessel is scheduled for delivery in June 2023.
Danfoss Power Solutions’ Editron division has been commissioned by Cheoy Lee Shi...
Alcatraz City Cruises was the first to introduce hybrid-powered passenger ferry ...
Team Norway is joining forces to increase the export of zero-emission passenger ...
Lisbon’s debut all-electric ferry has been delivered by shipyard Astilleros Gond...
Austal Philippines has delivered the 115-metre, high-speed vehicle-passenger fer...
Bureau Veritas (BV) has announced that it will class two hybrid double hull, dou...
The technology group Wärtsilä will supply dual-fuel engines and high-performance...
The ferries will serve Molslinjen’s routes to the islands of Als and Samsø.
Havyard Leirvik, which is owned by listed Eqva ASA, has signed a contract for th...
Whilst there are challenges to overcome, the ship which is to be delivered in 20...
When launched into operation, the final of three Ropax units constructed for Nor...
The vessel will start operating on Tallinn-Helsinki route on 13 December 2022
This contract gives the opportunity to showcase a new concept for cities that wa...
Major boost in choice and capacity for passengers and freight customers on the R...
EST-Floattech signs contract with Rolls-Royce Power Systems for long term cooper...