Jan De Nul Group has signed an agreement with Osbit Ltd (UK) for the design and ...
For the largest offshore wind farm in Denmark, Jan De Nul Group is installing a ...
Bureau Veritas (BV) has developed a new notation to recognize the performance of...
The brand-new dredger Willem van Rubroeck docked in the Port of Ghent on January...
The Singaporean shipyard Keppel Offshore & Marine Ltd., successfully delivered t...
The Connector, built in 2011, is a DP3 Ultra Deepwater Multipurpose Subsea Cable...
Jan De Nul Group installed the first offshore wind turbine for the 109.2 MW Taiw...
When complete, Dogger Bank will generate enough energy to power over 4.5 million...
The Flemish government, Port of Antwerp and SeReAnt together improve the water q...
Jan De Nul reaches important milestones for TPC Offshore Wind Farm in Taiwan
Jan De Nul Group has started offshore installation activities for the TPC Offsho...
Ørsted Wind Power North America LLC selected Jan De Nul Group to install a 12MW ...
Hopper Dredger Alexander von Humboldt is the first to sail 2,000 hours on 100% s...
Nearshore and onshore construction works in Taiwan have started at the landfall ...
32/44CR engines to power Jan De Nul Group’s floating installation crane vessel
Huisman and Jan De Nul Group has announced that they have joined forces for the ...