The OOSV will replace the CCGS Hudson, the Canadian Coast Guard’s oldest and lar...
The new vessel, a replacement of their current vessel, is expected to enter serv...
Hadera has a large deadweight capacity, a shallow full load navigational draft o...
She is set to be delivered to Svitzer A/S in April 2021.
NB 517 is the second of three vessels ordered by Swan Hellenic from Helsinki Shi...
BAE Systems will supply and integrate the electric hybrid power and propulsion s...
Both ships will be built at the KHI Sakaide Works shipyard and are set for deliv...
The customised Fuel Gas Supply Systems (FGSS) have been specially developed to a...
She will be the eighth of a total of 20 units to be built for Viking Cruises 04
Two Damen Stan Pontoon delivered to De Klerk in Werkendam, the Netherlands
It is being built at Hyundai Mipo Dockyard in Korea
The workboat is solely based on electric power from batteries and will be charge...
Damen Shipyards Group has signed a contract for a Shoalbuster 2711 – the second ...
Falcon No. 5 and Falcon No. 6 join fleet of Damen FCS vessels in support of offs...
ABB has secured a contract with Haemin Heavy Industries shipyard to provide a co...
The Canopée will be equipped with four 30-metre high Oceanwings.