The heavy duty 3,000 type Ram Luffing crane is especially suited for harsh North...
For the offshore wind farm Luchterduinen in The Netherlands, Jan De Nul was requ...
Robert Allan Ltd. has developed a methanol-fueled RAptor 2400 Crew Transfer Vess...
The contracts for the firm 3 vessels have an indicative total value of euro 140 ...
Kongsberg Maritime has signed a contract with VARD shipyard to supply a large pa...
Ørsted and ATP, Denmark's largest institutional investor, are bringing in three ...
Following an EU tender, Ørsted has signed strategic volume contracts with Bladt ...
Global Offshore has been awarded a contract for the installation and burial of 2...
Van Oord’s offshore installation vessel MPI Resolution will commence its work fo...
New VIKING evacuation kit puts turbine tower safety first top to bottom
This Recommended Practice can now be used as a technical reference for seismic d...
GE Renewable Energy will provide its expertise to strengthen ORLEN’s competitive...
The vessels are the third and fourth Incat Crowther-designed vessels for MHO & C...
The main change is a completely revised section on floating stability.
Kincardine Project Takes Installed ABS-Class Floating Turbines to 80MW
The park has a production capacity of 604 MW, corresponding to the annual consum...