The oil and gas industry, which is traditionally a laggard in the adoption of connected technologies, is increasingly deploying digital twins to improve decision-making.
The Barossa development consists of infield subsea infrastructure tied back to the centrally located floating production storage and offloading (FPSO) vessel.
Located in water depths from 600 to 1,200 meters and about 150 kilometers from the Angolan coast, Zinia Phase 2 resources are estimated at 65 million barrels of oil.
Seadrill Limited has secured a four year firm contract with four one year options, for the West Saturn drillship with Equinor Brasil Energia Ltda for work on the Bacalhau field in Brazil.