Five methanol engines are ready to power Van Oord's offshore installation vessel...
Vox Apolonia is Van Oord’s second hopper dredger equipped with an LNG fuel syste...
The final monopile for CrossWind’s Hollandse Kust Noord wind farm was successful...
About 70% of the channel has currently been deepened from ‑14.5 to ‑16 metres an...
Van Oord has signed a contract with North Ayrshire Council to construct a flood ...
Named Vox Apolonia, the energy efficient dredger is equipped with green features...
Van Oord’s offshore installation vessel Aeolus will get a major crane upgrade.
Van Oord kicked off the construction of the offshore wind farm Hollandse Kust No...
By installing a new, longer boom on Aeolus’ existing crane, the vessel will be r...
Van Oord has been selected as preferred contractor for the construction of the B...
Van Oord and DEME will carry out trenching, pipe pull operations and prepare the...
The new vessel will mainly operate to support European wind farms.
The vessel is due for delivery to the owner, Dutch marine contractor Van Oord, i...
Van Oord has been awarded two new contracts to reinforce the coast at the Romani...
Van Oord and Subsea 7 have been contracted by ExxonMobil affiliate Esso Explorat...
The scope covers the project management, engineering, and installation of approx...