29.3 C
New York

Tag: Gato do Mato

The technology has completed over 20,000 hours of at-sea testing. It weighs less than 3.5 kg, is no larger than a shoebox, and is powered by waste heat from the exhaust.
Grande Pacifico is the first ship in a new series of five PCTCs to be built by CMHI.

Shell invests in the Gato do Mato project in Brazil’s pre-salt

The development plan includes the installation of a floating production storage and offloading (FPSO) vessel and is designed to produce up to 120,000 barrels of oil per day.

Recent articles

spot_img