The FPSO “Errea Wittu” will produce approximately 250,000 barrels of oil per day
ABS Certification for Repair Method for Localized Damaged Parts Due to Corrosion
Voyageur Spirit FPSO to be redeployed and Shuttle Tanker Nordic Brasilia to be c...
Moored some 150 kilometers off the coast of Rio de Janeiro, at a water depth of ...
The initial three-year, multi-million pound, contract will see Petrofac’s Asset ...
The Alvheim field is one of the most successful developments on the Norwegian co...
The FPSO vessel will be deployed at the field, located in the giant "pre-salt" r...
BM-C-33 will be Equinor’s second FPSO in Brazil using combined cycle gas turbine...
Technology group Wärtsilä will operate the power modules onboard a Floating Prod...
A digital twin of each FPSO vessel will be used to capture engineering and opera...
The Petrojarl Knarr FPSO was transported to Aker Solutions yard at Stord in Augu...
Hull and marine works, external turret and topsides module installation and conv...
MODEC will design and construct the FPSO based on its M350 new-build design. Uar...
A newbuild FPSO vessel, P-71 sailed away from EJA’s shipyard and will be deploye...
Petrofac will continue to manage the entire supply chain including rig or vessel...
Salt Ship Design AS designs harsh environment FPSO hull for the Bay du Nord proj...