20.7 C
New York

Tag: W2W

Seismic events can significantly affect wind turbines, foundations, offshore substations, power cables and installation vessels, creating engineering challenges beyond those addressed by conventional wind and wave design approaches.
The vessels will be built at the Dajin Heavy Industries shipyard in China based on a design by Groot Ship Design and incorporating a predominantly European makerslist.

Ampelmann secures W2W Project with Horizon Maritime in Nigeria

Ampelmann has recently secured a new contract off the coast of Nigeria. The A-type system was mobilised on the Horizon Enabler vessel to perform...

Recent articles

spot_img