The vessels will operate in the Mediterranean under the Grimaldi Lines and Minoan Lines brands and will be equipped with engines capable of running on methanol
Saipem has compIeted the installation of offshore foundations for wind turbines, part of the Seagreen development, the largest wind farm offshore Scotland
Seaway 7 is managing the engineering, procurement, construction, and installation of Seagreen’s 114 wind turbine generator foundations and approximately 300km of associated inter-array cables.
Swire Blue Ocean (SBO) clinches contract with MHI Vestas Offshore Wind for the transportation and installation of wind turbine generators at Seagreen offshore windfarm