11.2 C
New York

Tag: deck

The season lasted more than 7 months — from mid-October to the end of May (for comparison: last year was almost 5 months).
The SEAP-II FPSO (P-87) will be designed to produce 120,000 barrels of oil per day

World’s first ever road transportable floating dry dock

Solis Marine Engineering helps design the world’s first ever road transportable floating dry dock

Recent articles

spot_img