The first vessel will be chartered for a period of 303 days, with an option to extend for an additional 40 days, while the second vessel will be deployed for 224 days, also with a similar extension option.
The four new Konecranes RTGs are equipped with advanced safety and operational features, including an Anti-Truck Lift Prevention System and a gas-type fire prevention system.
According to Ukrainian intelligence, Slavyanin was the last railway ferry of the Russian invading forces in the Kerch Strait that remained afloat after previous strikes.