2.5 C
New York

Tag: UCL

The Dragon 12 powerplant has been installed (grid-connected) for 9 months since May 2025 and has provided valuable production and operational data.
The eighth and final vessel scheduled for delivery to the Commonwealth in 2038.

Study: Arctic sea ice thinning faster than expected

Sea ice in the coastal regions of the Arctic may be thinning up to twice as fast as previously thought, according to a new modelling study led by University College London (UCL) researchers.

Recent articles

spot_img