The spare cable was delivered to Rosyth by the Prysmian Powerlinks’ Cable Enterprise, a Cable Laying Vessel, where it was spooled from the vessel, along a cable highway and onto the carousel.
Integrated ABB power and propulsion package win from Colombo Dockyard brings milestone Azipod® installation for advanced cable-laying and repair vessel that will support offshore wind farms.
Petrofac has collaborated with asset management specialist, James Fisher Asset Information Services (JF AIS), to eliminate the need for offshore surveys ahead of modification scopes, reducing time and cost.