North Wales tidal stream energy project, Morlais, has had a significant boost with the announcement that three new turbine developers have signed-up to the project.
This may represent a better design concept for bulk hydrogen production as opposed to, for instance, remotely located electrolysers at a terminal or platform, away from the wind turbine generator, due to reduced costs and energy losses.
The three-year Horizon 2020 funded WaveBoost project has drawn to a close with a step change improvement achieved to the reliability and performance of wave energy technology.