The site with the potential for up to 1.5GW in the Irish Sea was brought to market through Offshore Wind Leasing Round 4 in 2021 but development was discontinued in January 2026.
The technology group Wärtsilä will collaborate with ABS and Hudong-Zhonghua Shipbuilding (HZS) to develop a flexible, future-proof, and modular LNG Carrier (LNGC) vessel concept.