The ZeaWatch Docking Assist system combines a range of technologies to provide the crew with a comprehensive overview of infrastructure, both above and below the waterline.
Developed by EnBW, He Dreiht consists of 64 Vestas V236-15.0 MW wind turbines and marks the first commercial-scale installation of Vestas' flagship offshore wind turbine
Port of Toulon, which handles over 1.6 million ferry and cruise passengers annually, has committed to ABB Shore Connection technology at a key stage in its sustainability drive.
In order to receive the world’s largest oceangoing vessels, the fairway leading into the Port of Gothenburg needs to be deepened by around four metres and six kilometres of fairway need to be dredged.
The Azurtane vessel docking user interface will be trialled on Red Funnel’s high-speed ferry, Red Jet 7, in March 2020.
Solent University’s School of Media...
Two Carnival cruise ships crashed Friday morning in Cozumel, Mexico.
Hundreds of cruise ship passengers are sharing videos and stories of a collision on Friday,...