NCP has decided to invest in a new crane with the advanced technology necessary to simultaneously increase capacity and take them further along the path to electrification.
By installing a new, longer boom on Aeolus’ existing crane, the vessel will be ready to handle the newest generation up to 15 MW turbines for offshore wind projects.
The Finnish logistics company is strengthening operations with an additional order. The order was received in June 2022 and will be delivered in the first half of 2023.
Jan De Nul Group ordered a high-end crane simulator covering its two Next Generation Offshore Installation Vessels Voltaire and Les Alizés, soon to be delivered.