Offshore cable-laying specialist Nexans has put to the test Vestdavit’s innovative MissionEase boat-handling system on its state-of-the-art newbuild Nexans Aurora ahead of starting installation work on renewable power projects worldwide.
FLOTANT – an EUHorizon 2020-funded project – has successfully completed the validation of an innovative dynamic cable concept for deepwater floating wind projects, unlocking the potential for greater wind power resources at lower cost.
Fugro has completed the offshore fieldwork phase of a high-profile multidisciplinary contract for Global Marine that will help determine subsea routes for 16 new fibre optic cables in the Hebrides and the Orkney and Shetland Islands.
TKF has signed a contract with Van Oord for the Baltic Eagle offshore wind farm. For this project TKF will supply approximately 79 km 66 kV inter- array cables.
First mission assigned: the execution of the Viking Link, the submarine cable connection between the UK and Denmark, and the world’s longest power interconnection
The spare cable was delivered to Rosyth by the Prysmian Powerlinks’ Cable Enterprise, a Cable Laying Vessel, where it was spooled from the vessel, along a cable highway and onto the carousel.
Integrated ABB power and propulsion package win from Colombo Dockyard brings milestone Azipod® installation for advanced cable-laying and repair vessel that will support offshore wind farms.