World’s largest, zero-emission, battery powered bulk carrier will get a solar energy system producing 172,8 kWp (twice as much as Wattlab’s previous project)
The project scope involved water column monitoring, environmental sampling, seafloor imaging, air quality analysis, and the installation and recovery of metocean moorings.
NORDEN has signed a two-year Contract of Affreightment (COA) with Enviva to transport a significant volume of wood pellets from the United States to Europe over a two-year period, commencing in 2026.
The agreement covers the operator's two latest vessels, the 'Yamato' and the 'Settsu', and is designed to ensure their uninterrupted service reliability.