Galileo Galilei is dredging the bay’s access channel, increasing its depth from -14 metres tot -16 metres and improving maritime accessibility to the port area.
WindFloat Atlantic wind farm is now operational.
After the energisation of the 20-km cable connecting the offshore wind farm and the substation of Viana do...
Intertek, a leading Total Quality Assurance provider to industries worldwide, has provided client representation for the oversight of the successful export cable installation and...