Once fully commissioned, the wind park will generate 3.3 TWh of renewable electricity per year; enough to meet approximately 3% of the Netherlands’ total electricity demand.
The Hugin B topside has departed Aker Solutions' Verdal yard in Norway for the Yggdrasil offshore development, marking the completion of a series of platform structures delivered for Aker BP's Yggdrasil and Valhall PWP-Fenris projects over the past three and a half years.
The Jill is the sixth vessel in a Rapport 2800 tugboat series designed by Robert Allan Ltd. and the second of two identical vessels designed specifically for Gulf LNG operations.
The tugboat is equipped with a BEH2YDRO high-output hydrogen dual-fuelled ICE and a high-pressure hydrogen gas storage system with large-capacity and supply system, supplied by JPNH2YDRO — a joint venture between TSUNEISHI Group and CMB.TECH.