Fugro has commenced a detailed pre-construction survey – including locating potential unexploded ordnance. Survey results to help define the final cable routes and turbine locations.
At the same time, the Danish Energy Agency has narrowed down the site for the wind farm from 440 km2 to 286 km2 as a result of the site-investigations.