27.6 C
New York

Tag: shutdown

Cadeler has secured a €247 million EIFO-backed green term loan to partially finance the construction of its third A-class offshore wind installation vessel, Wind Apex
The image, taken in the port of Gelendzhik, shows the vessel moored alongside a quay with a large breach visible on its starboard side.

Power shutdown at JNPT

Please be informed that as part of the Augmentation project being undertaken by the JNPT towards upgrade of the electricity infrastructure at the port

Recent articles

spot_img