The new terminal is located right next to the dock, and the walk from the ship to the terminal is shorter than before. This speeds up and simplifies both disembarking and boarding.
Wildcat well was drilled in production licence 827 SB from the Awards in predefined areas (APA) in 2022. The well was drilled using the Deepsea Atlantic rig.