29.3 C
New York

Tag: RAstar

RES has been awarded the Safety from the System and Operational Control contract for ScottishPower Renewables’ East Anglia TWO offshore wind farm.
The technology has completed over 20,000 hours of at-sea testing. It weighs less than 3.5 kg, is no larger than a shoebox, and is powered by waste heat from the exhaust.

New RAstar 3200-W tugs to be built at Sterling Shipyard

The first tug is expected to be delivered in October 2025.

HaiSea Marine Goes Green with new LNG Canada Tugboat Fleet

Five tugs will form the world’s most technologically advanced fleet to date

A pair of RAstar 3200-SX terminal support/escort tugs for Scotland

The two tugs are replacing two of the three tugs currently operated by the owners.

Two RAstar 3200-CL tugs delivered to Yiu Lian Dockyards Ltd

The HAI KUN will be joined by her sister the HAI PENG in August 2020.

Sanmar deliveres the first of three new tugs for Svitzer Sohar

First of three RAstar 2900-SX built by Sanmar for Svitzer Sohar

Recent articles

spot_img