The new terminal is located right next to the dock, and the walk from the ship to the terminal is shorter than before. This speeds up and simplifies both disembarking and boarding.
UK outfit Hydro Group and French partner Wenex Equipements have wrapped up cabling support work on the 2MW Floatgen floating offshore wind project off the coast of France.
US Department of Energy proposed to provide funding to Lake Erie Energy Development Corporation to construct and operate a 20.7 MW offshore wind project