The collaboration supports technology assessment, regulatory readiness, classification, and verification pathways of emerging solutions across new energies, and advanced offshore infrastructure
HHLA’s floating cranes transport 42-metre-long pipes which will be embedded into the bottom of the river Elbe to create additional waiting points for ships.
The...