The monopiles, the first of a total of 197, produced for Hornsea 3, the world’s single largest offshore wind farm, each weigh an average of 1,670 tonnes and 90m in length.
HHLA’s floating cranes transport 42-metre-long pipes which will be embedded into the bottom of the river Elbe to create additional waiting points for ships.
The...