The equipment was supplied free of charge and is intended to strengthen the port's ability to respond to pollution incidents and protect the marine environment.
Wildcat well was drilled in production licence 827 SB from the Awards in predefined areas (APA) in 2022. The well was drilled using the Deepsea Atlantic rig.