20.3 C
New York

Tag: CORE POWER

The installation comprises a total of 52 Vestas V236-15.0 MW wind turbines, each rated at 15 megawatts.
In early May, the module left the yard to be transported to the Bouri field, located approximately 170 kilometres off the Libyan coast.

LR and CORE POWER to conduct next-generation nuclear container ship regulatory study

Joint regulatory assessment study will determine the safety and regulatory considerations for a potential next-generation nuclear-propelled feeder container ship to undertake cargo operations at a port in Europe.

Recent articles

spot_img