18.9 C
New York

Tag: cargo vessel

The installation comprises a total of 52 Vestas V236-15.0 MW wind turbines, each rated at 15 megawatts.
In early May, the module left the yard to be transported to the Bouri field, located approximately 170 kilometres off the Libyan coast.

CyberLogitec published an infographic illustrating OPUS Terminal M

OPUS Terminal M is an advanced terminal operating system for multipurpose terminals. Designed to meet the growing needs of terminals, OPUS Terminal M has the...

Nigeria: Pirate Attack

As informed by ARC (Africa Risk Compliance Limited), a cargo vessel was attacked by 2 speed boats with 5 armed men on one boat,...

Recent articles

spot_img