NKT has finalized an offshore repair of the 450 kV HVDC power cable system BritN...
Nexans awarded Hadselfjord subsea cable contract to strengthen the security of s...
Fincantieri subsidiary strengthens its position in the offshore wind market
Van Oord has ordered a next-generation custom-built green cable-laying vessel.
The Connector, built in 2011, is a DP3 Ultra Deepwater Multipurpose Subsea Cable...
Elia Asset SA, 50Hertz Transmission GmbH and Nemo Link Ltd. each have awarded NK...
NKT was awarded the order to repair two interconnectors between Denmark and Norw...
TenneT starts a pilot designed to improve biodiversity at cable intersections in...
To meet the growing demand for power cables in the offshore industry NKT increas...
The 9,000km system, with landing points in Singapore and India, will also have b...
The new contract includes the installation and commissioning of the complete tur...
Foundations and export cables installed as Triton Knoll drives towards first pow...
The Baltic Cable - a 250 km long power cable - interconnects the power grids of ...
NKT awarded turnkey high-voltage DC power cable for the offshore wind connection...
Fugro started their survey programme for Alcatel Submarine Networks (ASN)
The Shetland HVDC Link will be the first transmission connection between the Sco...