10.6 C
New York

Subsea Technology

Vineyard Wind selects Jan De Nul Group for inter-array cable supply and installation

Vineyard Wind 1 will be the first commercial-scale offshore wind project in the United States.

Maersk Drilling secures nine-month contract to reactivate Mærsk Innovator

The contract is expected to commence in December 2021.

Kongsberg Maritime joins global ocean floor mapping initiative

The Nippon Foundation-GEBCO Seabed 2030 Project and Kongsberg Maritime enter partnership as the race for a complete map of the world’s seabed accelerates

Contract award for the joint venture between DOF Subsea and Aker Solutions

Project scope includes the removal and disposal of Subsea infrastructure

Fugro wins another IRM contract with Petrobras in Brazil

Petrobras has awarded Fugro a 3-year contract for subsea inspection, repair and maintenance (IRM) services in Brazil.

Magseis Fairfield awarded a large, five-month OBN survey in Asia

The duration of the survey is approximately five months and is scheduled to commence in the fourth quarter 2021.

Baker Hughes to deliver SCMS for Chevron subsea compression project

Subsea compression manifold technology to support Chevron-operated Jansz-Io Compression (J-IC) Project

A first for Egypt as Fugro revolutionises subsea installation for GUPCO

Fugro delivered subsea positioning support for the installation of multiple subsea structures off the coast of Egypt.

NnG’s spare export cable delivered safely to the Port of Rosyth

The spare cable was delivered to Rosyth by the Prysmian Powerlinks’ Cable Enterprise, a Cable Laying Vessel, where it was spooled from the vessel, along a cable highway and onto the carousel.

Neptune Energy installs world’s longest ETH production pipeline

The 37 kilometre electrically trace-heated (ETH) pipe-in-pipe solution will transport oil from the field to the Njord A platform, operated by Equinor.

Fugro helps NOAA update nautical charts in Alaska for improved maritime safety

The new bathymetry was acquired from two multibeam-echosounder-equipped survey vessels

Subsea 7 completes Pipeline Bundle for Buzzard

This month marks the successful installation of a 5km Pipeline Bundle for the CNOOC International Buzzard Phase II (BPII) project.

Recent articles

spot_img