A preliminary study on LNG bunkering for ships berthed at Hong Kong’s Kai Tak Cruise Terminal has affirmed the feasibility of safely conducting ship-to-ship LNG bunkering simultaneously with passenger operations at the terminal.
During the project, around 1.1 million cubic metres of soil was dredged and 800,000 cubic metres of rock was made available for use in area construction in Helsinki.
The IT solutions provider for the global logistics industry will provide CODEX electronic delivery solution to Mediterranean Shipping Company (MSC) in Thailand