The Baltyk II and Baltyk III offshore wind farms are large-scale renewable energy projects located within the Polish Exclusive Economic Zone in the southwestern Baltic Sea
An Optimarin Ballast System (OBS) installed on Seven Pacific, a Subsea7 vessel, in 2015 has been upgraded to meet the ballast water treatment system (BWTS) requirements of the United States Coast Guard (USCG).