The first vessel will be chartered for a period of 303 days, with an option to extend for an additional 40 days, while the second vessel will be deployed for 224 days, also with a similar extension option.
Woodside has signed a revised lump sum turnkey engineering, procurement and construction (EPC) contract with Bechtel for the development of the three train 16.5 million tonnes per annum foundation development of Louisiana LNG.