The partnership focuses on the local construction of advanced naval vessels tailored specifically to Indonesia’s unique geographic and operational demands.
Poland’s Border Guard has detained a Russian dry-cargo ship which had suddenly sped towards the Polish coast, and turned out to be led by an inebriated captain.
The offshore substation for the Arcadis Ost 1 wind farm, with a planned capacity of 247 megawatts, should be installed in 2022, followed by work for the grid connec-tion.