Moored some 150 kilometers off the coast of Rio de Janeiro, at a water depth of ...
The initial three-year, multi-million pound, contract will see Petrofac’s Asset ...
The Alvheim field is one of the most successful developments on the Norwegian co...
The FPSO vessel will be deployed at the field, located in the giant "pre-salt" r...
BM-C-33 will be Equinor’s second FPSO in Brazil using combined cycle gas turbine...
Technology group Wärtsilä will operate the power modules onboard a Floating Prod...
A digital twin of each FPSO vessel will be used to capture engineering and opera...
The Petrojarl Knarr FPSO was transported to Aker Solutions yard at Stord in Augu...
Hull and marine works, external turret and topsides module installation and conv...
MODEC will design and construct the FPSO based on its M350 new-build design. Uar...
A newbuild FPSO vessel, P-71 sailed away from EJA’s shipyard and will be deploye...
Petrofac will continue to manage the entire supply chain including rig or vessel...
Salt Ship Design AS designs harsh environment FPSO hull for the Bay du Nord proj...
The FPSO would source electricity from a wind farm or other renewable source to ...
New generation FPSO to minimise emissions with carbon capture and reinjection as...
FPSO Nganhurra has a production capacity of 100,000 barrels of oil per day