Tag: FPSO
SBM Offshore signs FPSO Alexandre de Gusmão contracts
FPSO Alexandre de Gusmão will be deployed at the Mero field in the Santos Basin...
Keppel awarded FSRU conversion and FPSO integration work
The total value of the two projects is expected to be around S$200 million, including...
Saipem: awarded a new offshore contract for the Búzios...
Saipem will use its FDS, its state-of-the-art field development ship, for the installation...
McDermott and SBM Offshore to deliver fourth FPSO in Guyana
The FPSO will be spread moored in water depth of about 5,900 feet (1,800 meters)...
Aker Solutions wins FEED for Wisting FPSO
The intended FEED contract includes an option for engineering, procurement, construction...
Submitting PDO for Frosk in the Alvheim area
The Frosk field, located approximately 25 km southwest of the Alvheim FPSO in the...
BW Offshore selects VIKING solutions for large FPSO project
VIKING boat and davit solutions meet BW Offshore requirements for large FPSO bound...
Sembcorp to execute front-end engineering design work for...
Dorado will be one of the lowest emission intensity oil and gas projects in the...
MODEC’s FPSO Carioca MV30 achieves First Oil and starts...
MODEC was responsible for the engineering, procurement, construction, mobilization...
Petrobras starts production of FPSO Carioca in Sépia field
Petrobras informs that it has begun producing oil and natural gas from FPSO Carioca,...
SBM Offshore signed LOI for FPSO Alexandre de Gusmão lease...
The unit will be deployed at the Mero field in the Santos Basin offshore Brazil
Keppel O&M awarded US$2.3b contract to build FPSO for Petrobras
The contract is on an engineering, procurement and construction (EPC) basis, with...
Final investment decision for Bacalhau phase 1 in Brazil
The investment is approximately 8 billion USD.
Keppel O&M awarded US$2.3b contract to build FPSO for Petrobras
Scheduled for completion in late 2024, the FPSO will be customised for deployment...
NOV announces contract award by BW Offshore for STP system...
The Barossa development consists of infield subsea infrastructure tied back to the...
Angola: Total starts production from Zinia Phase 2
Located in water depths from 600 to 1,200 meters and about 150 kilometers from the...