In addition to the construction of a scalable electrolyser with an initial output of 100 megawatts, the further development of the site into a so-called "Green Energy Hub" is planned.
Kongsberg Maritime has announced that it will be supplying key positioning and monitoring equipment to Equinor’s Hywind Tampen floating wind farm, as part of a contract with industrial solutions provider Wood PLC.