Heerema rolls up Peregrino C jacket

When the new Peregrino C platform in Brazil comes on stream late 2020, it will create 200 long term jobs offshore – and create ripple effects onshore Brazil.

The platform contributes to prolonging the lifetime for the Peregrino field and will create value for 20 years.

This summer pipelines and subsea equipment manufactured in Brazil is installed at the seabed and late this year the platform will be installed at the field.

The legs come first, and this spring the final steel structure was lifted into place in a roll-up.

Video: Equinor