Damen has announced the acquisition of Southampton-based I.M.E Group Ltd. The acquisition follows close collaboration between the two parties since the opening of Damen Services’ UK Service Hub in 2021.
Wildcat well 34/6-9 S ("Avbitertang") was drilled in production licence 554, 35 kilometres northeast of the Snorre field and 125 kilometres west of Florø.
World’s largest, zero-emission, battery powered bulk carrier will get a solar energy system producing 172,8 kWp (twice as much as Wattlab’s previous project)
The vessel will be chartered on a long-term basis (up to 20 years) to EDF LNG Shipping SAS for LNG transportation under the ship management of Gazocean.
World’s largest, zero-emission, battery powered bulk carrier will get a solar energy system producing 172,8 kWp (twice as much as Wattlab’s previous project)