TECO2030 ASA has received an order for 1 TECO2030 Ballast Water Treatment System (BWTS) from Avangard Shipyards, for the ship AVANGARD II, worth approximately NOK 1 million.
The large-scale build-out plan sets out a stepwise installation of tidal kite arrays, each with 20-40 MW installed capacity, at four verified locations.
The cost of insuring merchant ships sailing to ports in the Black Sea has spiraled out of control, becoming a huge potential impediment to the movement of Russian cargoes from the region.
The main objective of FLOTANT project is to develop the conceptual and basic engineering, including performance tests of the mooring and anchoring systems and the dynamic cable.