Ørsted has signed a memorandum of understanding (MoU) with the infrastructure division of Acciona to explore options for floating offshore wind foundations.
Provaris has launched a gaseous hydrogen floating storage solution called H2Leo, with a design capacity range of 300 to 600 tonnes of hydrogen, expandable to up to 2,000 tonnes.
Saipem has compIeted the installation of offshore foundations for wind turbines, part of the Seagreen development, the largest wind farm offshore Scotland
Wärtsilä has designed the simulation lab to address the very latest developments in operational equipment and systems, the facility can accommodate 14 students at one time.
Fugro has been awarded a contract for site characterisation services in support of one of the largest long-term field development programmes in the United Arab Emirates.
The first of 69 wind turbines has been installed at the Hollandse Kust Noord offshore wind park at the North Sea, developed by CrossWind, a joint venture of Shell and Eneco.
Bauge is tied back to the recently upgraded Njord platform. Recoverable reserves in Bauge are estimated at 50 million barrels of oil equivalent, mainly oil.