ScottishPower Renewables has selected Peel Ports Great Yarmouth as its port of choice for pre-assembly on the 960MW East Anglia Two offshore wind farm.
The HIPERWIND project has developed new design simulation models that reduce the levelized cost of energy by up to 9%, thus making offshore wind turbine construction and operation more cost-effective and reliable.