Porthos, the project for CO2 capture and storage in Rotterdam, is on schedule to store an annual amount of 2.5 million tonnes of CO2 from the industry in empty gas fields beneath the North Sea as from 2024.
The U.S. Naval Station projects will ensure U.S. Navy surface vessels based in Mayport and submarines from Kings Bay have safe access to the Atlantic Ocean.
Port of Tyne has completed a detailed modelling exercise and long term analysis of its electricity network, as part of its decarbonisation and clean energy strategy.
This initiative maintains synergies of collaboration with the International Association of Ports and Terminals (IAPH) and brings together 12 of the most important ports in the world
A uniform shore-based power system is conducive to user-friendliness and stimulates the use of shore-based power, a facility for supplying ships in port with power.
Each round trip is managed by HCH Marine and takes around seven hours and each day this operation removes 36 truck journeys from the already congested roads.