The University of Barcelona is working on a citizen science project to better understand the origins and final destination of the plastics that reach the sea
These powerful flows could be capable of traveling at speeds of up to eight meters per second, carrying plastic waste from the continental shelf to depths of more than 3,200 metres.
In addition, Konecranes Port Services will retrofit eight existing Konecranes RTGs currently operating at the port. The retrofits will be completed by Q4 2025.
After a construction period of 22 months, the Cruise Port Shore Power installation was officially opened on 31 March, 2025, on the Holland Amerikakade.
AD Ports Group and Columbia Group have formed a joint venture to optimise third party vessel operations, and that of AD Ports Group’s ocean-going fleet, through state-of-the-art fleet management systems.
The simulator provides a highly realistic training environment, allowing course delegates to practice complex operations and emergency preparedness in a fully immersive, controlled conditions.
AD Ports Group and Columbia Group have formed a joint venture to optimise third party vessel operations, and that of AD Ports Group’s ocean-going fleet, through state-of-the-art fleet management systems.