The project, known as Windbostel Ost and Windbostel West, is a joint venture between RWE and TotalEnergies, with a combined generating capacity of 4 gigawatts (GW).
The agreement is for the construction and delivery of a new FollaPower 50EL hybrid workboat. This vessel will be number 106 from the Folla shipyard and will be the sixth vessel of this specific type to be delivered to Nova Sea.
The Crown Estate set to partner with Equinor and Gwynt Glas – a joint venture between EDF Renewables UK and ESB – to drive the creation of new jobs and economic growth through new floating windfarms off the coasts of Wales and South West England.
The agreement includes basic and detail design for the “Next Generation Med” class vessels, which will be deployed across key Mediterranean routes under the Grimaldi Lines and Minoan Lines brands.
The European Union is planning a large-scale modernization of ports and transport infrastructure in terms of preparation for a potential war with Russia.