A private 5G network-enabled Innovation Lab is set to transform the Port of Blyth into the UK North East’s premier technology hub, providing unprecedented access to 5G technology for industries in the North East region.
Synergies leveraged to realise OranjeWind offshore wind farm with an installed capacity of 795 megawatts as first system integration project on Dutch market.
Today, Altera Infrastructure celebrated the naming of its Floating Production Storage and Offloading vessel, FPSO Petrojarl Kong and its Floating Storage and Offloading vessel, FSO Yamoussoukro.
The patented elevator style assembly system promises easier, safer and faster wind turbine and nacelle installation and maintenance, without the use of large cranes and heavy-lift barges or vessels.