Construction on the project started in winter 2018 with commencement of the onshore works and the windfarm is expected to be fully operational in 2022.
Subsea 7 has announced the award of a contract by Vattenfall for the Hollandse Kust Zuid (HKZ) 1-4 offshore wind farm project, located between 18-36km off the Dutch coast in the North Sea.
This may represent a better design concept for bulk hydrogen production as opposed to, for instance, remotely located electrolysers at a terminal or platform, away from the wind turbine generator, due to reduced costs and energy losses.