This may represent a better design concept for bulk hydrogen production as opposed to, for instance, remotely located electrolysers at a terminal or platform, away from the wind turbine generator, due to reduced costs and energy losses.
Northland Power Inc. has confirmed that its 252 megawatt (MW) Deutsche Bucht offshore wind project achieved full completion on March 31, 2020.
All 31 monopile...
VolkerInfra has secured a new £15.5m contract from Prysmian PowerLink to deliver services at the Neart na Gaoithe (NnG) offshore wind farm in Scotland.
The...